D J Greaves - Older News: To Dec 2007

  • Dec 07: Rediscovered an audio broadcast discussion of the Cambridge iTV Trial, an early trial of residential broadband services.

  • Nov 07: Compiled a first C# example to hardware RTL Times Table Demo.

  • Sept 07: DJG Sabbatical Leave Starts

  • Sept 07: Journal publication by my student B Bastani: High-level Open Evolvable Systems Design By Process-oriented Modeling: Application to DNA Replication Mechanism accepted for ACM Software Engineering Notes Nov 07.

  • Sept 07: Communication-centric computation (C3D) project grant approved by EPSRC (Moore, Mycroft, Mullins, Greaves).

  • June 07: Trade sale of Tenison EDA to Arc International. (Tenison was founded by DJG in March 2000.)

  • May 07: Workshop publication by my student S Kell: Rethinking Software Connectors at SYANCO-07.

  • April 07: Journal publication by my student B Bastani: Requirements Analysis Framework for Open Systems Requirements Eningeering ACM SIGSOFT Software Engineering Notes, Volume 32 , Issue 2.

  • March 07: Getting these four papers finished: drafts.

  • February 07: Delivering CompArch lectures to part II.

  • January 07: Organised Computer Laboratory Supporters' Club Briefing: Pattern Recogniton, Information Retrieval and Machine Learning.

  • December 06: Became wed to Aldyth. The picture above, taken after the event, is myself (with glass), Andy Hopper FRS CBE (lifelong mentor) and six of my current postgraduates.

  • November 06: Computer Laboratory Wednesday Seminar :'Safety Checks in a domain of collaborating applications' PPT SLIDES.

  • November 06: 'System Level Design' presented at the SRG Thursday Talk PPT SLIDES.

  • October 06: Presentation to Lockheed Martin:'Code Reflection for Reliable Fieldbus Systems.'

  • Older news link...