HOME   PREV   NEXT (TLM Modelling: Adding Timing Annotations)

TLM - Can it estimate performance and utlisation ?

We'll use the average cost if we are not separately modelling contention. Otherwise, use the minimum (base) cost and let the contention modelling mechanism audit the remainder.

If we are running with cross-compiled firmware, we do not have accurate instruction stream, so must use bulk estimates, on basic-block basis or coarser.