UPS move 10th January 2017

On the 10th January the UPS was moved. This left core services vulnerable to building power outage until it is recommissioned later that day.

At the same time one of our switches in the West Cambridge Data Centre was moved within the cabinet to improve air-flow.

This entry was posted in Local IT systems. Bookmark the permalink.